8000W Solar System DC12V/24V to 110V/220V Off-Grid Inverter System 100A 500WbS

8000W Solar System DC12V/24V to 110V/220V Off-Grid Inverter System 100A 500WbS

USD 141.29 USD
SKU: KdreSOzY
Brand: Unbranded
GTIN: Does Not Apply
Condition: New
Categories: Electrical Supplies

Specifications

Types110V
BrandUnbranded
Dimensions480*280mm(16.5inx11in)
OutputDC 18V + USB 5V
Power Range25W - 500W
Weight400g

A1W Inverter. A1W Inverter ×1. 500W Solar Panel. (6)Car Inverter Cable ×1. 200W Solar Panel ×1. Power Range: 25W - 500W. Charging Current: 30A-100A. Efficiency: >90%.

Related Items